Load and Performance Testing Services

Peak-Traffic Load Tests From Engineers Who Fix What Breaks
Load and performance testing services built on the traffic you expect: load, stress, spike, and soak tests against targets you approve, and fixes from the same engineers.
Load tests in MasterControl’s CI/CD
Load tests in MasterControl’s CI/CD
Workload models from your traffic data
Workload models from your traffic data
600+ specialists
600+ specialists
Load and Performance Testing Services 1920
Load and Performance Testing Services 1440

Industry Leaders We Work With

Our Edge

Findings Become Fixes

Load testing, root-cause analysis, and fixes from one engineering team.
Findings get fixed

Findings get fixed

We fix the code behind slowdowns. For Global Auto Auctions, typical searches improved from 8–12 seconds to approximately 100–300 ms.
Tests in CI/CD

Tests in CI/CD

Short checks in your CI/CD, full runs before releases. At MasterControl, GitHub pipelines were integrated with Playwright, Gatling, and Sonar.
Delivery Manager included

Delivery Manager included

Every engagement includes a dedicated Delivery Manager, a live risk register, and a formal QA checkpoint, so findings get owned.
Targets agreed first

Targets agreed first

Pass/fail criteria are agreed up front: p95 and p99 response times, error rate, throughput, and headroom above your expected peak.
Honest about staging

Honest about staging

We write down how your test environment differs from production and say which results carry over to production.
Built around peaks

Built around peaks

Seasonal sales, product launches, reporting deadlines, a large new customer: scenarios start from the traffic you expect on that day.
US headquarters

US headquarters

Zoolatech is headquartered in Miami, Florida. More than 20 of our clients have market capitalizations above $1 billion.
Engineers who stay

Engineers who stay

The engineers who run the first load test stay through fixes and the re-run, so nobody rebuilds context.
Beyond the Report

Load Test Results Only Matter If Someone Acts on Them

We trace bottlenecks to their likely cause where monitoring allows, fix them with your team, and rerun the same scenarios.
50–100x

50–100x

faster search, Global Auto Auctions redesign
~100–300 ms

~100–300 ms

typical search, from 8–12 seconds

What performance testing services show before a traffic event

  • Response times and error rates under the traffic you expect.
  • Throughput at the volumes your business plans for.
  • The point where the system stops coping, and why.
  • Run before a sale, launch, or reporting deadline, not after.
  • A production failure moved into a test you control.
What We Run

Our Software Performance Testing Services

Performance testing services check how software responds, scales, and recovers under load before a release or a known traffic event. A typical engagement covers load, stress, spike, soak, scalability, volume, and resilience tests for web applications, APIs, and mobile back ends.
Software load testing

Traffic you expect

  • Runs the traffic you plan for, including daily peak
  • Response times, error rates, and throughput checked against targets
  • Load testing services across web, API, and mobile back ends
  • Targets agreed before the first run
Stress and spike

Past the expected peak

  • Load raised past the peak until targets fail
  • Shows where the system breaks and how it fails
  • Spike tests add sudden surges, like a sale going live
  • Push notifications reaching every user at once
Endurance (soak)

Hours at steady load

  • Steady load held for hours, not minutes
  • Catches memory leaks and connection-pool exhaustion
  • Finds queues that grow and never drain
  • Spots response times drifting upward over a business day
Scalability and capacity

How far adding instances helps

Volume testing

Production-size data

  • Fast queries on small test data checked at production size
  • Long order histories and large files loaded realistically
  • Covers the parts of the system that grow with you
  • Shows which data-heavy paths slow first
Resilience testing

Failing components on purpose

  • Database node, cache, broker, or third-party API failed under load
  • Run in a test environment, never in production
  • Shows whether failover works and how users are affected
  • Measures how long recovery takes
Engagement Outputs

What You Get From a Performance Testing Engagement

Each output is agreed with you and reused on the next run, so the second engagement starts from the first.
Workload model

Workload model

Built from production analytics, logs, and business forecasts. Without history, we write down the assumptions and agree them before scripting.
Pass/fail targets

Pass/fail targets

Response times at p95 and p99, error rate, throughput, resource limits, and headroom above peak, agreed before the first run.
Reusable scripts

Reusable scripts

Version-controlled scripts that can be rerun and extended, and wired into CI/CD for regression checks on later releases.
Findings report

Findings report

Each bottleneck traced, where monitoring allows, to its likely cause: code path, query, service, or infrastructure limit, ranked by impact.
Fixes applied

Fixes applied

Our engineers fix the code, queries, and configuration behind the bottlenecks, working with your team on each change.
Confirmation re-run

Confirmation re-run

The same scenarios run again after the changes and are compared with the baseline, so improvement is measured, not assumed.
Web, API, Mobile, AI

Application Performance Testing Services for Every Layer

Application performance testing services cover every layer a user request touches.
Web applications
API load
Mobile back ends
AI features

Customer journeys together

Users hit search, cart, checkout, and reports at once, so we test them together.
  • We load: the journeys together, with realistic think times and navigation paths, as website load testing.
  • We check: which journey slows first and which shared component, such as a database or session store, causes it.
  • Result: a ranked list of journeys and the shared components behind each slowdown.
Image slot

Endpoints at volume

REST and GraphQL endpoints under concurrent calls with realistic payloads.
  • We load: endpoints with concurrent calls and realistic payloads, including data-driven API requests in Postman where useful.
  • We check: latency, error rates, rate limits, timeouts, and retries at volume.
  • Result: how the APIs behave under load. Functional checks of the same endpoints belong to API testing.
Image slot

Launch-day volumes

Mobile apps depend on APIs that must answer fast on slow networks at launch-day volumes.
Image slot

LLM dependencies

LLM-backed features add their own limits under concurrent use.
  • We load: LLM-backed features like any other dependency, with concurrent requests and realistic prompts.
  • We check: model latency, token throughput, provider rate limits, and cost per request under load.
  • Result: response-time targets for each AI feature and fallbacks for when the provider slows down.
Image slot
Testimonials

What Our Customers Say

“In the case of Zoolatech, it's a very tight partnership.
The team at Zoolatech is incredibly collaborative, and we work as a team despite being thousands of miles away from each other.”
Spencer Rascoff
CEO Match Group
5/5
“Zoolatech has been a key technology partner for Pandora,
enhancing our software development and deployment capabilities. They're ambitious, supportive, fast-moving, and well-skilled, with sound ethical values.”
Erika Romsics
Contract and Vendor Manager, Pandora
erica
5/5
“The apps they’ve developed give us the opportunity to get more customers.
We’re providing more services to target big customers. We can install jobs faster and identify reduce bottlenecks, so we’re providing a better customer experience.”
Aida Youssef
Senior Director of Software Engineering, Complete Solaria
5/5
“Zoolatech has access to a deep talent pool and knows how to identify client's needs.
With the help of Zoolatech, went from a very early and incomplete prototype to the MVP release, the first production release, and the first paying customer!”
Greg Wagenhoffer
CEO, GreenVisr
5/5
“Zoolatech enabled us to build a world-class engineering team quickly and efficiently.
Zoolatech's pre-screening process and engineer training are customized for providing effective engineers that can contribute immediately to accelerating product roadmaps.”
Shariq Minhas
CTO, SVSG
5/5
“We can recommend Zoolatech
for their talent pool, attention, ability to understand our requirements, candidate screening process and constant communication.”
Chaitanya Pallapothula
SVP, Tailored Brands, Inc.
5/5
“Zoolatech’s developers quickly became an integral part of our team effort
with whom we shared daily stand up calls. Overall, Zoolatech fit well with our needs for agile development and continued to adapt as our needs evolved.”
Forrest Glick
UX Designer, Stanford University
5/5
“Working with Zoolatech has been a driving force in our business offerings.
The team utilizes it's experience and expertise meshing with our internal team creating a positive work environment. Zoolatech is by far one of the best teams to work with in the industry.”
Kris Naidu
CEO, Zeacon
Kris Naidu CEO, Zeacon
5/5
Peak Readiness

What to Prove Before Peak Traffic

Before a seasonal sale, launch, or reporting deadline, a load test should answer six questions.
check icon

Your expected peak

We turn the event into load: how many users, orders, or API calls per minute at the busiest moment, based on past events, analytics, and business forecasts. The number is written down and approved before scripting.
check icon

Headroom above peak

Testing only to the forecast leaves no margin for a forecast that is wrong. We agree with you how far past the expected peak the test should go, and the run continues until that level holds or fails.
check icon

The breaking point

Load keeps rising until targets fail. The report names the resource that gave out first, CPU, database connections, a queue, or a downstream service, and the load level at which it happened.
check icon

How the system fails

Slow pages, errors, and a full outage are very different failures. We check that timeouts, queues, and circuit breakers degrade service in the order you choose, so a busy day stays slow rather than dark.
check icon

Recovery after the surge

When load drops, latency should return to baseline. We measure how long that takes, whether queues drain on their own, and whether anything needs a manual restart before normal service resumes.
check icon

Third-party limits

Payment gateways, identity providers, and partner APIs have their own rate limits. We check each provider’s published limits, estimate when the peak would hit them, and use mocks where a provider will not accept test load.
Engagement Steps

How a Performance Testing Engagement Runs

Six steps from targets to confirmed fixes, planned backward from your release or peak date. Durations depend on scope and are set once the workload model is agreed.
Step 1

Goals and targets

We list the events you are preparing for, the critical user journeys, and the pass/fail targets for each.
Step 2

Workload model

Traffic mix, user paths, think times, and peak multipliers come from your analytics and logs. You review and approve the model before any script is written, so the test reflects your traffic.
Step 3

Environment and test data

We document how the test environment differs from production and agree how test data is produced: synthetic records or masked copies, with no live personal data in any run.
Step 4

Scripts and baseline

We write scripts in Gatling, the tool in our MasterControl pipelines, or in your team’s existing load tool where agreed. A baseline run at normal load sets the reference point for every later comparison.
Step 5

Load, stress, spike, soak

Each run is monitored across application, database, and infrastructure, so slowdowns in the results can be traced to their likely cause rather than guessed at from response-time charts alone.
Step 6

Analysis, fixes, re-run

We report bottlenecks by business impact, fix them with your team, and repeat the runs to confirm the gain.
Share your peak date and traffic data. We’ll plan backward from it.
Contact Sales

“57% of respondents said their most recent major outage cost more than $100,000.” — Uptime Institute, 2025 Annual Survey

A peak-day failure is an outage with a date you knew in advance. Testing, fixing, and re-running before that date gives you a chance to find the failure first.
Staging and Production

Four Reasons Load Test Results Mislead

Test environments are smaller than production and test data simpler. We name four gaps before you rely on results.
01

Staging smaller

We record differences in instances, data, and integrations, test at a known ratio, and say which conclusions hold for production.
02

Unrealistic test data

Identical test accounts behave nothing like your customer base. We generate synthetic data or mask production copies at real volumes.
03

Untestable third parties

Payment, identity, and partner APIs rarely allow load tests. We use mocks or service virtualization and check published limits separately.
04

Production never tested

Where risk justifies it, we agree read-only production checks with your SRE team, at low-traffic hours, with a stop rule.
Between Releases

Performance Testing in CI/CD, Monitoring, and Fixes

What happens between peak events, and who acts on results.
CI/CD pipeline
Monitoring
Canary releases
Results to fixes

Checks per merge

Short load checks run on merges or nightly and fail the build when a key response time regresses.

Traces during runs

We read application traces, database metrics, and infrastructure dashboards during every run, in the APM and logging tools agreed.
  • Output: a slow endpoint in the report comes with the likely query, service, or resource behind it.
  • Scope: tools are agreed at the start, so observability matches what your team already reads.

Everyday changes

Canaries catch regressions with real users on a small share of traffic, but cannot show a peak never seen.
  • Canary: for everyday changes, with real traffic and a quick rollback.
  • Load test: for the peak that has not happened yet, run before the date.

Performance engineering

Performance engineering starts where the report ends: profiling, query rewrites, caching, and infrastructure tuning, then testing again.
  • One enterprise client: critical peak-period payment failures eliminated, transaction processing time reduced from 12 minutes to 5 minutes.
  • Another enterprise client: up to 42x faster sorting on critical financial fields and 30x faster totals calculation and aggregation.
Image abstract 1 368
Build or Bring In

In-House Team or Independent Performance Testing Company?

When comparing performance testing consultants, ask who builds the workload model and from which data, which targets apply, what staging results mean for production, and who fixes findings. If your security team requires it, ask which certifications the vendor holds.
Keep it in-house

Keep it in-house

When your engineers have run load tests at this scale, own a production-like environment, and the next event is distant.
Bring a partner

Bring a partner

When a peak date is fixed, nobody has modeled this load, or results need engineers who fix what they find.
How we engage

How we engage

Team extension, managed delivery, or an offshore delivery center. When you outsource performance testing services, plan from the peak date.

Launching Something Big?

Name the launch and its date, and we’ll suggest the next step.
Stack From Our Cases

Technologies Behind Our Load Tests

Gatling in MasterControl’s pipelines, JMeter and Gatling in our high-scale platform work for Grubhub, and the platforms they ran against.
Gatling
Gatling
JMeter
JMeter
Playwright
Playwright
Sonar
Sonar
GitHub Actions
GitHub Actions
AWS
AWS
Kubernetes
Kubernetes
Docker
Docker
Java
Java
Spring
Spring
Python
Python
PostgreSQL
PostgreSQL
Apache Cassandra
Apache Cassandra
and others
Why Choose Us

Why Businesses Trust Us

logo
At Zoolatech, we create engineering teams for industry leaders across the US and Europe — teams that move fast, think big, and deliver strong impact.
96%
Client Satisfaction
300+
Successful Projects
2017
Year Founded
98%
Retention Rate
team sport photo
At Zoolatech, we create engineering teams for industry leaders across the US and Europe — teams that move fast, think big, and deliver strong impact.
Engineering Excellence. Every Time.
main award png (1)
At Zoolatech, we create engineering teams for industry leaders across the US and Europe — teams that move fast, think big, and deliver strong impact.
team sport photo
600+
Employees
Headquarters
USA
Development Centers
PL
UA
MX
TR

Test the Peak Before Your Customers Do

Tell us about your project, and we’ll suggest the next step.
Contact Sales
What Buyers Usually Ask Us

What is the difference between load testing and performance testing?

Performance testing is the umbrella term for checking speed, stability, and scalability under load, and load testing is one type: it runs the traffic you expect, including your normal peak, and checks response times and errors against targets. Stress and spike tests go beyond that load to find limits, and soak tests hold it for hours to expose slow degradation.

What is the difference between performance testing and performance engineering?

Performance testing measures how a system behaves under load and shows where it slows down or fails, while performance engineering acts on those results: profiling code, rewriting slow queries, adding caching, and tuning infrastructure, then testing again. We do both, so the engineers who find a bottleneck can also remove it.

Should we use an independent performance testing company or test in-house?

Keep it in-house if your team has run load tests at this scale, owns a production-like environment, and has time before the traffic event. An independent performance testing company helps when the peak date is fixed, nobody has done this before, or results need engineers to act on them.

How long does a performance testing engagement take?

It depends on how many user journeys and APIs are in scope, whether a production-like environment and test data already exist, and how many fix-and-retest cycles you need. Once scope is clear, we plan the work backward from your release or peak date.

How much do performance testing services cost?

Cost depends on scope: the number of critical user journeys and APIs, target load and test duration, how close the test environment is to production, how test data is produced, the load-generation infrastructure needed, and how many fix-and-retest cycles you need. An estimate follows once we understand your architecture, traffic data, and the event you are preparing for.

What if our staging environment is not like production?

Most are not, so we start by writing down the differences: instance sizes, data volumes, integrations, and network paths, then test at a known ratio to production, mock third-party services that cannot take test load, and state which results transfer and which do not. Where risk is high, short read-only checks in production can confirm the findings.

Do you provide performance testing services in the USA?

Yes. Zoolatech is headquartered in Miami, Florida, more than 20 of our clients have market capitalizations above $1 billion, and we plan tests around your peak dates and report results against the targets your team approves before the first run.